1,1 % energy yield increase with Vestas Power Performance Optimisation (PPO) – Independent validation result
Waila has recently validated the success of Vestas Power Performance Optimisation (PPO) in a windfarm with Vestas V-112 wind turbines in Northwestern Europe for one of the largest renewable energy infrastructure asset manager in Europe. The validation analysis was able to proof the the energy yield of the wind farm increased by 1,1 % in the […]